Completed Projects
The following Core Projects were completed during the First Phase of IGBP:
- BAHC – Biosphere Aspects of the Hydrological Cycle (1991-2003)
- DIS – Data and Information Systems (1993-2001)
- GAIM – Global Analysis Integration and Modelling (1993-2004)
- GCTE – Global Change and Terrestrial Ecosystems (1992-2003)
- JGOFS – The Joint Global Ocean Flux Study (1988-2003)
- LUCC – Land Use and Cover Change (1994-2005)

